RICHARD L.
HOLSBERRYPAGE 1
Permanent
Address:
201
Riverview Drive
Dayton, TN 37321
Telephone:
423-298-8737
Mobile
SUMMARY
Seven years’ experience as Journeyman, Master
Electrician. Twenty Nine years experience as a Principle in Project
Controls, Project Planning, Cost Controls, Estimating and Resource Allocation
Manager. Seven Years Experience in DOE Construction, Environmental
Decommissioning and Restoration, Eighteen Years Commercial Construction
Projects, Industrial Projects, Fossil Power Plants Construction and Major
Modifications. Nuclear Power Facilities Construction, Startup & Forced
Outages.
EXPERIENCE:
Nuclear
Technical Services
1920 E 17th St, Idaho
Falls, ID 83404
April 2015 to
Current
Hanford
Nuclear Reservation
Sr
Project Controls Specialist
•
Performed Project Controls Scheduling and Forensics utilizing Acumen Fuse
analysis of schedule data, cost information, risk models, earned value and
project performance.
•
Performed in-depth investigations with construction managers to ascertain
& document reasons for modification, claims, administration.
•
Develop and
maintain out year Resource Loaded CPM progress and performance schedule for
Washington River Protection Site
Peak
Solutions
409
Palomino Drive, Amarillo, TX 79118
November 2013 to April 2015
Portsmouth
Nuclear Site
Project
Controls Specialist
• Performed
technical (REA) Request for Equal Adjustments expertise (Project Controls
Forensics) with regard to technical analysis of construction modifications
estimates & claims for overruns by contractors.
•
Performed in-depth investigations with construction managers to ascertain
& document reasons for modification, claims, administration.
•
Assigned the responsibility for preparing Findings of Fact, estimation/cost
analysis, schedule analysis using latest version of Recognized Estimating and
scheduling software such as Means & Primavera (P6)
Restoration
Services Inc.
Highway
58 at Flannigan's Loop Rd, Oak Ridge, TN 37830
January
2012 to February 2013
TVA NUCLEAR POWER DIVISION
TVA FOSSIL POWER PLANTS
PRINCIPLE PROJECT CONTROLS SCHEDULER
• Develop and
maintain Resource Loaded CPM progress and performance schedule for Appendix
“R” Modification’s (NRC Commitment)
• Develop and
maintain Resource Loaded CPM progress and performance schedule for
Fukushima Related (NRC Commitment) Modification’s for Seven Nuclear Power
Plants
• Develop Schedules
utilizing for Twelve Fossil Power Plants Modification’s
• Provide timely
Performance Assessments for all Project Modification’s.
• Responsible for
timely schedule forecasts utilizing established power group forecast
methodologies and work processes in Primavera Enterprise 6.2.
• Provide timely
variance analysis and an early warning to management on critical or near
critical activities. Provide corrective action plans as required.
• Actively contribute
to the Risk Management Process
• Align with client
and maintain excellent client relations
Pinnacle
Inc.
5501
Lyndon B Johnson Fwy • Suite 600 • Dallas, TX • 75240
August 2011 to November 2011
LUMINANT POWER – SANDOW & OAK GROVE
POWER STATIONS
PRINCIPLE OUTAGE PROJECT CONTROLS ENG
·
Develop and
maintain CPM progress and performance, schedule, and cost baselines for the
project Shutdown, Construction & Startup scopes of work
·
Provide
timely Performance Assessments for all Project Modification’s.
·
Responsible
for timely and accurate cost and schedule forecasts utilizing established
power group forecast methodologies and work processes Primavera Enterprise
6.2.
·
Provide
timely variance analysis and an early warning to management on critical or
near critical activities. Provide corrective action plans as required.
·
Actively
contribute to the Risk Management Process
·
Align with
client and maintain excellent client relations
Peak
Solutions
409
Palomino Drive, Amarillo, TX 79118
March 2011 to July 2011
Portsmouth
Nuclear Site
Subject Matter Expert
·
Performed
technical (REA) Request for Equal Adjustments expertise (Project Controls
Forensics) with regard to technical analysis of construction modifications
estimates & claims for overruns by contractors.
·
Performed
in-depth investigations with construction managers to ascertain &
document reasons for modification, claims, administration.
·
Assigned the
responsibility for preparing Findings of Fact, estimation/cost analysis,
schedule analysis using latest version of Recognized Estimating and
scheduling software such as Means & Primavera (P6)
Peak Solutions
409 Palomino Drive, Amarillo, TX
79118
Aug 2010 to Feb 2011
Nevada
National Security Site
SR PROJECT CONTROLS ENG
·
Performed
technical expertise Project Controls Forensics with regard to technical
analysis of construction modifications & claims & analysis of
construction project schedules using current technologies.
·
Performed
periodic job visits to projects within my assigned areas during various
stages of construction to observe, document, & ensure scheduling
activities are performed in compliance with stated requirements &
criteria (Earned Value).
·
Performed
in-depth investigations to ascertain & document reasons for modification,
claim, and administration or scheduling errors.
·
Assigned the
responsibility for preparing Findings of Fact, estimation/cost analysis,
schedule analysis using latest version of Primavera (P6) at the Nevada
National Security Site
Pinnacle
Inc.
5501
Lyndon B Johnson Fwy • Suite 600 • Dallas, TX • 75240
September 2009 to May 2010
LUMINANT POWER – SANDOW POWER STATION
PRINCIPLE OUTAGE PROJECT CONTROLS ENG
·
Develop and
maintain CPM progress and performance, schedule, and cost baselines for the
project Shutdown, Construction & Startup scopes of work
·
Provide
timely Performance Assessments for all Project Modification’s.
·
Responsible
for timely and accurate cost and schedule forecasts utilizing established
power group forecast methodologies and work processes Primavera Enterprise
6.2.
·
Provide
timely variance analysis and an early warning to management on critical or
near critical activities. Provide corrective action plans as required.
·
Actively
contribute to the Risk Management Process
·
Align with
client and maintain excellent client relations
Fluor
100 Fluor Daniel Dr, Greenville, SC 29607
September
2008 to July 2009
Fluor
– Oconee Nuclear Power Station, Seneca, SC
Project
Controls Manager
·
Field Project
Controls Manager for the Oconee Nuclear Power Station Project
·
Work with
functional management to define requirements, recruit, and develop staff
members for the life of the project. This includes but is not limited
to mentoring or coaching of junior staff members.
·
Develop and
maintain progress and performance, schedule, and cost baselines for the
project for both Construction & Commissioning scopes of work
·
Provide timely
Performance Assessments for all construction Project Controls
Personnel.
·
Responsible
for all aspects of the Change Management system
·
Responsible
for timely and accurate cost and schedule forecasts utilizing established
power group forecast methodologies and work processes Primavera 3.1.
·
Review and
approve estimates from ROM thru Final Issue for construction.
·
Responsible
for timely and accurate financial (PMAR/margin) forecast for Oconee Nuclear
Power Station Project
·
Provide
timely variance analysis and an early warning to management on critical or
near critical activities. Provide corrective action plans as required.
·
Contribute to
Portfolio assignments as required by functional management.
·
Actively
promote participation in Project Controls Knowledge Community
·
Actively
contribute to the Risk Management Process
·
Align with
client and maintain excellent client relations
High
Bridge Assc.
3260
Pointe Parkway , Suite 200, Norcross, Georgia 30092
July
2007 to September 2008
HBA-INC – Department Of Energy, Oak Ridge, TN
Sr.
Project Management Consultant
· As part of
DOE Headquarter Integrated Project Team I am creating a Complex wide integrated
schedule containing in excess of 200,000 CPM Logic driven tasks utilizing
Primavera Enterprise 6.0
· Assist DOE
Federal Project Directors with updating and progressing projects on a routine
basis
· Provide
coaching and mentoring to DOE staff in Scheduling/Cost Controls.
· Assist DOE
Oakridge in reviewing/preparing contractors, Bechtel Jacobs (BJC) at ETTP
Site, Foster Wheeler Environmental Corporation (FWENC) at the TWP Site, (BJC)
at Y-12 National Security Complex, and (BJC) at Oak Ridge National Labs for
(IPR) Independent Project Reviews plus (EIR) External Independent Reviews to
Certify near term performance baseline of the Environmental Management
Program. Also assess the reasonableness of the (OPER) Out -Year Planning
Estimate Range
· Creating
Schedules for Complex Wide Waste Transportation
· Assigned
as lead scheduler for Portsmouth, Ohio and Paducah, KY D&D Sites
containing over 30,000 activities.
MWH
Global, Inc, 370 Interlocken Blvd, Suite 300, Broomfield, CO 80021
Jan
2007 to June 2007
MWH – Army Core of Engineers, Portland, OR
Sr.
Project Management Consultant
· Assist
Client project and program teams with project initiation
· Assist
Client project managers with updating and progressing projects on a routine
basis
· Provide
coaching and mentoring to client staff in scheduling basics, the client’s P2
System, and the use of Primavera Enterprise Software
· Assist
client in identifying competency gaps and recommend solutions to close gaps
· Assist
project delivery teams with work-break-down, schedule development, resource
identification and planning, loading of projects and resources, schedule
modification and maintenance
· Assist
local help desk with calls/issues related to the client’s P2 system and
Primavera software.
Project Services Group, LLC (PSG), 780
Buford Hwy Suite 202 A, Suwanee, GA
Feb 2006 to Jan 2007
Project Solutions Group – Bechtel Vitrification Plant, Hanford, WA
Sr. Project Estimator Trending ( 7 Months )
·
Project
Control Organization:
·
Create
estimates for Engineering identified trends that were not with-in initial or
present scope of work.
· Core
Group Sr. Scheduler
·
Perform
Analysis on 50,000 + activity schedule for errors and have schedulers make
corrections to conform to EVM Standards.
·
Vice President of NW Division for
(PSG) Project Services Group
·
Managing
recruitment, contracts, and personnel employed by PSG.
Stragic
Management Solutions Inc – Pantex DOE Site, Amarillo, TX
Oct 2005 to Feb 2006
Sr.
Project Estimator
·
Capital &
Expense Projects Division:
·
Responsible
for Creating Multidiscipline Estimates for Replacement Value of existing
facilities that were constructed in the 1940 time frame. The estimates ranged
in $150 Million to $200 Million for Replacement Construction based upon
current Material & Labor Rates.
July 2005 to Oct 2005
Sun Technical Services – Browns Ferry
Nuclear Power Station, Athens, AL
Sr.
Project Estimator
·
Modifications
Division:
·
Responsible
for the development of Estimates for Modification Performance Errors (PERs)
reporting man-hours required for re-performance of repairing errors
made by craft during construction. Also responsible for variance analysis of
indirect man-hour charges.
September
2004 to July 2005
Complex Technical Services – Pantex DOE
Site, Amarillo, TX
Sr.
Project Management Consultant
Capital &
Expense Projects Division:
·
Responsible
for the development, maintenance, updating and performing / explaining
variance analysis of the engineering, procurement, fabrication,
implementation, startup and testing schedules for plant modifications and
major projects. Assist in the migration of project schedules from
Primavera’s P3v3.1 to P3ec application software.
November 2003 to August 2004
Team
Associates, LLC – Dayton, TN
Latin
America General Electric Project Control Manager.
·
Assigned as
the Manager of the Project Controls personnel throughout Latin America for
General Electric Co, Electrical Power Plant Installation and Maintenance
·
Maintained
Schedules and Financials for all generator up-rates over $250,000 including
Nuclear, Fossil, and Hydro Power Stations. Maintained Templates for schedules
and maintained history files on each project utilizing Primavera P3ec
Enterprise and ePC for the updating and tracking financials for the P3ec
projects.
November 2001 to November 2003
Team
Associates, LLC – Brownsville, TN
Project
Lead Scheduler
·
Maintained
Master Schedule (P3) for construction & Start-up of four each Simple
Cycle Combined Fuel Oil & Natural Gas Fired General Electric Generators
at TVA Site. Provided oversight of Contractors Schedules Civil,
Electrical, Mechanical, Structural, Tank Fabricators, Fire Protection,
Painters and Startup Schedules that I integrated into the Master Schedule on
a weekly basis. Performed analysis and Provided Reports to Management
of GE and TVA.
January 2001 to November 2001
Foster
Wheeler Corporation – DOE Site Fernald, OH
Project
Lead Scheduler
·
Worked with a
Red Team to develop schedules (P3) for construction of a facility to remove
heavy metals from a tank farm and process it into yellow bricks for permanent
storage at a Nuclear Waste Storage Facility. After completion of this
task was reassigned to the home office in Norcross, GA as Lead Electrical
Estimator working on many Production Type Facility Estimates.
·
Was a
Consultant with the company for two years after leaving full time employment.
February 2000 to January 2001
Bechtel
Telecommunication Frederick, MD
Project
Scheduling Supervisor
· Direct production of a FY00 through FY03 Baseline Schedule
and a Lifecycle Integrated Master Schedule conforming to the American
Telephone & Telegraph (ATT) Wireless System Build Plan for constructing
9,000 new cellular wireless communication base station sites. Supervised 42
Market Cities Project Controls Personnel in providing Level I, II and III
schedules and curves for Bechtel Project Management Reviews and ATT
approval. Created desktop Guide (Business Process) for project controls
personnel. Created Procedures for Integration of ATT Scheduling System
Software into a Bechtel Format. Direct daily activities necessary to
support scheduling/cost functions. Trained Functional & Business Managers
in the processes required for updating weekly status.
September
1999 to February 2000
Westinghouse
Chemical Weapons Incinerator
Integrated
Master Schedule
·
(EVMS) Earned
Value Management System. Produce and Plot Level I, II and III schedules for
Project Management Reviews and Army Corp of Engineer approval. Create
desktop Guide (Business Rules) for all project controls personnel.
Direct daily activities necessary to support scheduling/cost functions.
Trained Control Account Managers in the processes required for IBR
certification in the use of EVMS standards.
August 1999 to
September
1999
TVA Muscle
Shoals Power Service Shops
Planner
Cost Estimator/Scheduler GUBMK Partnership
· Develop & Implement an in house estimating process
specifically for Fabrication Shop, using Timberline commercial estimating
software. Create Work Breakdown Structure for Fabrication Shop
Estimates. Develop & Implement performance tracking goal
data. Estimate required quantities for Bid Packages, and plan work to
meet start of construction dates. Used Empirical Data to develop
average unit rates, standard deviations, etc for families of projects.
Instruct Planners & others on the use of the estimating process.
April
1998 to July 1999
Hanford
Plutonium Finishing
Plant
Project Manager Babcock Wilcox
/Informatics Corp Contractors
· Manage Schedulers, Estimators, and Contract Buyers
Personnel in day to day business. Scheduling Field Lead for DOE
TIGER TEAM Estimating/Scheduling for multi-year $180,000,000. Decommissioning
of Plutonium Finishing Plant Project.
February
1998 to April 1998
Hanford
Decommissioning Project “K”
Basin
Developer
/ Instructor DOE ABC Type Estimating
· Assisted in development of ABC Estimating Guide,
Instructed “K” Basin DOE Managers and Cost Account Managers in development of
the ABC type estimates for decommissioning multi-year projects. Also assisted
in the development of the estimates.
October 1997 to
February 1998
South Texas
Project Power Plant
Software
Application Team Senior Lead Scheduler
· Modified Schedule of Software Change-out for entire plant
accounting, payroll and budget software system to support new ownership,
including incorporating Resources of required programmers to enable
completion of the project on time (31 Dec. 1997). Facilitate and Lead
weekly status meetings to inform management of requirements to be initiated
in time for converting ownership.
May 1996 to October 1997
RMI Demolition and Decommission Project
Senior Project Control Engineer
· Created and implemented a 10 year resource loaded schedule
Primavera P3, $150 million Timberline Assembly’s estimate and cost control
system (Micro frame) for decontamination/demolition/decommissioning a DOE
facility in Ashtabula, Ohio. As this development was in process we
maintained then existing program for project controls and reporting.
Also developed several estimates for utilizing new cleanup technology such
as, Soil Washing, Metals Wicking and Planting Various Crops to serve as a
wick for heavy metals.
May 1991 to May 1996
TVA-Watts Bar Nuclear Power Plant
Engineering Organization/Senior
Project Control Engineer
· Assisted in establishing a Project Control (P2) system for the
Engineering Dept. that created achievable milestones integrated with
Modifications Org. (P3), Startup Org. (P3) and Plant Maintenance Org. (MTS)
to allow budget, material & engineering to be in place at required time
of work implementation to successfully complete the project in the
established time frame & on budget.
Startup
Organization/Senior Project Control Engineer
· Developed & Implemented a spreadsheet (Lotus) that
tracked progress on the testing of 32,000 plant components, also had to
integrate this with the Master Baseline Schedule (P2). Utilizing
production, schedule, and regulatory requirements, various reporting mediums
were used to provide a comprehensive management report that was used for identification
and resolution of restraints to completion. Additionally, cost analysis
(freelance) was done on a periodic basis for all re-projections and changes
to the manpower requirements.
Modifications Organization/Senior
Project Control Engineer
· Created schedule for punch list items to bring plant
reactor to critical mass for online use. Also estimated number of craft
required to complete task to allow for gradual layoff of 1,500 construction
craft along with 800 support personnel. Attended two daily meetings
with plant VP and managers to report/ defend reasons for number of craft
still employed by Modifications.
May 1990 to May
1991
Palo Verde
Nuclear Power Station 1, 2, & 3
PSC
Management Organization/Senior Project Estimator
· Implemented the use of (Timberline) estimating software
for integrating (Premise) Schedule/Cost program for out yearlong term
construction, maintenance and plant outage requirements with preset
budgets. Provided task/engineering analysis for cost savings approaches
to complete the projects identified.
March 1990 to May 1990
Port Everglades Fossile Power Plants
1,2, & 3
FP&L
Management Organization/Senior Project Estimator
· Provided detailed multi-discipline estimates Lotus 123 for
a fossil fuel 750 Mega watt power plant overhauling the boiler and related
components. Also assisted in a prudence audit at the completion of the
project locating and identifying an overcharge in the amount of $1.2 million.
May 1989 to March 1990
Fort St. Vrain Nuclear Power Plant
PSC
Management Organization/Senior Project Electrical Estimator
·
Created
estimating and cost control program for Defueling Storage of Spent Fuels
Rods, decontaminating & decommissioning of the facility.
Additionally developed conceptual estimates Timberline for converting the
Plant to a fossil fired boiler unit. Worked directly for the Senior
Vice President to advise him daily of cost averages and predictions for future
cost.
September 1987 to May 1989
Turkey
Point Nuclear & Fossil Power Stations
FP&L
Project Control Organization Senior Project Electrical Estimator
· Created estimates (Lotus) back fit construction projects
to allow plant licenses to be extended for 20 years operation.
Developed the first Project Control Engineer position that allowed for using
personnel to be tasked with scheduling (P2), estimating and cost
engineering as one.
October 1985 to September 1987
Holmes & Narver Engineering
Senior Level III Electrical
Estimator Project Controls Organization
· Worked with engineers to develop electrical estimates
(Lotus) for a Multibillion $ construction of an Air Force Base.
Additional requirements were Quality Assurance of drawings, check for
constructability. The scope of work as a level III Estimator was to
manage the lower level
estimators in their daily assigned
duties along with reporting to upper management of any potential problem areas
encountered. Managed a staff of 12 onsite & inter-office lower
level estimators. All of the project estimates were DOE & DOD
construction that ranged from Multibillion $ down to $100,000
contracts. The estimating tools used were Saylor, Means, Richardson’s,
& California Institute of Estimating. These estimates were from
conceptual to final or as built types.
EDUCATION,
TRAINING & CERTIFICATIONS
·
Completed
Several Higher Education Courses, Completed International Brotherhood of
Electrical Workers Apprenticeship Program
·
Certified
Electrical Master Electrician, Certified Blue Print Reading Courses,
Certified NECA Foremanship Course, Certified Welder, Certified Motor Controls
Technician, Certified Optical Fiber Technician, Certified Richardson Eng.
School of Estimating (Construction & Process Facility)
·
Certified
Trade Services Estimating Courses,
·
Certified
California Institute of Construction Estimating
·
Certified
PRIMAVERA P6 Scheduling, Several Revisions to Current 6.14
·
Certified
Humphreys & Associates EVM Systems
·
Certified
PRIMAVERA P3ec Scheduling,
·
Certified
Performance Analysis
·
Certified
Risk Management
·
Certified 10
Hour OSHA Safety Course